Portfolio Bathroom Remodel

Bathroom remodel-Before

Bathroom Remodel Before

Bathroom remodel progress

Bathroom remodel-After

Bathroom remodel-After

This bathroom update project involved:
1) repainting existing cabinets in a satin black
2) Installing new cabinet hardware in brushed nickel and retro glass knobs
3) framing the existing mirror
4) new glass mosaic tile counter tops purchased from Home Depot, drop in sinks and faucets from Home Depot
5) new floor tile (4″ x 4″ black, 12″ x 12″ white and 4″ x 4″ blue glass)all from Home Depot
6) new tiles dispersed in shower(chiseled out random tiles so that a complete shower demo would not be required)
7) Paint-“Shale Blue” by Ralph Lauren from Home Depot
If you’d like to complete a project like this and just don’t know how, comment back and I’ll try to help with the “how to” advice!  Many of these topics will be covered on this site.  You CAN do it!

The URI to TrackBack this entry is: https://agirlcandoit.wordpress.com/2010/04/27/portfolio-bathroom-remodel/trackback/

RSS feed for comments on this post.

3 CommentsLeave a comment

  1. […] This post was mentioned on Twitter by Bren Veseleny. Bren Veseleny said: Portfolio Bathroom Remodel: http://wp.me/pSJdu-32 […]

  2. Thanks for this post! We’re in the process of remodeling our guest bath and this helps lots. 🙂


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: